How to construct the bathroom waterproof leakage repair project, a little leakage, how to deal with

Updated on Bathroom 2024-09-09
2 answers
  1. Anonymous users2024-01-24

    There are many treatment methods, which can be grouting and can be used to plug the leakage.

    Depending on the situation, it is best to find a professional waterproofing company to deal with it.

  2. Anonymous users2024-01-23

    Toilet (toilet) waterproof leak repair method.

    First, the bathroom floor is leveled first, for newly renovated or redecorated users If you want to replace the floor tiles in the bathroom After chiseling off the original floor tiles, you must first level the ground with cement mortar, and then make a draft of the lack of waterproof treatment. This avoids leakage of the waterproofing coating due to uneven thickness.

    Second, the joints should be painted in place, the joints between the bathroom wall and the ground, and the joints between the water and sewage pipes and the ground, which are the most likely places to cause problems. In the construction, you must urge the decoration workers to deal with these corners and corners, and all waterproof coatings must be applied "in place".

    3. Wall treatment is also very important In the general bathroom such as buried waterproof treatment, the wall should also be made about 30 cm high waterproof coating to prevent water from penetrating the wall. However, if the wall of the bathroom is a light wall that is not load-bearing, the entire wall should be coated with waterproof paint. If you use a two-door shower screen in your home, paint the two walls that are connected to each other as well.

    If you use a bathtub in your home, the height of the waterproof coating on the wall adjacent to the bathtub should also be higher than the top edge of the bathtub.

    Fourth, the waterproof experiment is essential After the construction of the toilet is completed, all the sewer in the bathroom is blocked, and a 25 cm high "barrier" is built at the door, and then 20 cm high slag is poured into the toilet. After 24 hours, check the surrounding walls and floors for leaks. This 24-hour waterproof test is the key to ensuring the quality of the bathroom waterproof project, and you must do it.

    5. Keep all the sewer pipes in the toilet unobstructed, including floor drains, sewer pipes of sanitary ware, etc. Keep it open.

Related questions
3 answers2024-09-09

The bathroom is waterproof and leakage, and the surrounding walls need to ensure that the height of the painting is not less than 30 cm; If there is a shower, the height of the waterproof paint applied on the installation of the shower faucet and the adjacent wall should not be less than 150 cm, preferably about 180 cm. >>>More

4 answers2024-09-09

First, we must do the leveling layer. First of all, the ground should be leveled with cement mortar (especially for rerenovated houses), and then waterproofing. This avoids the waterproofing coating leaking due to uneven thickness or puncture of the waterproofing membrane. >>>More

3 answers2024-09-09

Waterproofing must be done well.

1 answers2024-09-09

Preparation

This strain is a water-soluble liquid, and protective gloves should be worn when using it. Do not swallow or splash into eyes, rinse with water if contacted. >>>More

5 answers2024-09-09

Personally, after buying a house, all the interior waterproofing is reinforced again, which is safe and avoids trouble in the future.