When will the kitchen and bathroom plumbing be installed when building a house?

Updated on Kitchen 2024-09-29
3 answers
  1. Anonymous users2024-01-24

    Installation before the start of renovation works.

    The places to pay attention to in the installation are:

    1. The wall of the bathroom must be pasted with wall tiles, so the sewer pipe must be paid attention to the wall after the package has a certain tension to ensure that the wall tiles will not fall down and hollow after pasting, the traditional way is to use light steel keel cement pressure plate, the earliest use of wooden keel cement pressure plate but now these processes are basically no longer advocated to use, now should use red brick masonry and play expansion bolts on the new masonry wall and the original wall to ensure that the new masonry wall and the original wall can be better combined, In this way, there will be no hollowing and brick dropping.

    2. The water pipe will take up a lot of space, and the artificial bark package used for my water pipe is very beautiful and very simple, and it is convenient to disassemble and assemble the water pipe blockage in the future.

    3. You should move the squatting out a little, and then build a red brick wall to wrap the pipe and then paste the tiles.

  2. Anonymous users2024-01-23

    When building a house, the pipes of the kitchen and bathroom are drilled and installed after the foundation is built (i.e., the rough house), and finally waterproofing and decoration.

  3. Anonymous users2024-01-22

    According to the planning drawings, after the pipeline enters the house, the upstairs normal work watering, the pipeline is dry, the water is turned to the hole through the pipe installation, the individual home has determined the location, the eye can be left out when watering, the eye should be left large, the sewer PVC pipe is very brittle and can not be bent, and the mud can be pasted to death when the bricks are laid with a big eye. When watering, let the bricklayer give you a vertical hanging root line, and keep your eyes on the drill according to the line.

Related questions
3 answers2024-09-29

Finally, you can put it before the wardrobe at home.

2 answers2024-09-29

The bathroom wall and floor tiles are pasted and caulked after installation.

11 answers2024-09-29

Latest. 1. After it is done, it is to stick the floor tiles and wall tiles, generally speaking, the decoration is to do the water and electricity part (including the laying of wires and pipelines, washbasin) and kitchen components (the whole kitchen, shower, painter, etc.) can be installed sanitary ware (toilet, microwave oven, etc.), the laying of water pipes), refrigerator, after the completion of other processes (including carpentry). >>>More

2 answers2024-09-29

Do waterproofing first, and then do a closed water experiment after waterproofing, and then you can paste tiles.

3 answers2024-09-29

Modern decoration is a unified design, civil engineering also includes your kitchen and bathroom is not to be partitioned, and then the tile floor is done, with water and electricity can be used to decorate the kitchen and bathroom, especially pay attention to the ceiling water and electricity and your kitchen and bathroom cooperation. After the preliminary decision, it is important to communicate more during the renovation process.