The bathroom is equipped with a lift, and there are no floor tiles, and now I want to remove the shi

Updated on Bathroom 2024-08-08
1 answers
  1. Anonymous users2024-01-24

    The toilet is easy to block, if the pipe is a little short after dismantling, you can use a section of PVC110 pipe to connect the long flat opposite, and then put the toilet on the top of the toilet with cement ash.

Related questions
7 answers2024-08-08

The problem you are worried about in the bathroom floor national norms (the national norms are the minimum standards, and the quality of all decoration companies' construction projects must be implemented in accordance with this) has long been stipulated, and you can rest assured that when signing the contract, it is required to be implemented in accordance with national standards. If they can't even guarantee that, it proves that they have a problem and need to change companies. >>>More

8 answers2024-08-08

1. It is recommended that the original ground should be knocked out, waterproofed, and re-paved with floor tiles. This will save you a lot of trouble in the future.

1 answers2024-08-08

The electric water heater is installed, cut the hot and cold water tank on the wall, and the electric tank, and then fill the tank with cement after it is installed.

8 answers2024-08-08

Usable·· If you just think about aesthetics, you can only use it in hidden places, so that? If you use a place that is often used, it will affect the appearance · · The wear resistance of 2 times is not very good... The performance will be very low·· The wear resistance will also be reduced·· The water absorption rate will be very high...

7 answers2024-08-08

1. Calculation of wall tile area: bathroom perimeter x room height = interior wall tile area; Bathroom length x width = bathroom tile area. >>>More