I just bought a new house, and there was something wrong with the decoration, and the water in the b

Updated on Bathroom 2024-08-21
4 answers
  1. Anonymous users2024-01-24

    In fact, it is very simple, two problems, the first bathroom water can not flow down to prove that the slope of the bathroom is not done, the state stipulates that the ground of the bathroom must face the floor drain with a slope of 5%, which is convenient for running water, and the decoration company wants to deal with it, it is necessary to warp the floor tiles, refill them, and refill the bricks. Second, there are two possibilities for wall blistering, the first is that the building itself is defective, and the underlying base is not cleaned, resulting in wall blistering, and the other possibility is that the paint used by the decoration company is unqualified or the paint is increased in order to reduce the cost, so that the wall latex paint is uneven and too diluted. If the range is small, use latex paint of the same color (usually a bottle is reserved for you) to fill in, if the range is too large, you need to remove it all and repaint.

    If it is resolved through the law, it will be long and troublesome. If it is a decoration company, make a media complaint, and the decoration association will complain, or 315If it's a leather bag company, it's hard to say, it's not complicated to solve anyway, but it's very troublesome.

  2. Anonymous users2024-01-23

    1.The reason why the water in the bathroom can't flow is likely to be that the renovation workers did not do a good job when laying the floor tiles, or did not do it at all.

    2.The reason for the blistering of the wall is likely to be that the decoration workers do not calender the wall enough times, or use inferior base treatment agents to cause the quality defects of hollowing and hemp surface, you should also check in advance.

    You can take a look at the overall appearance of the wall, or use a level to check the flatness and verticality of the wall to see whether the workmanship is serious and fine!

    In fact, I suggest that for those irresponsible decoration workers, resolutely let them deal with it first, as long as the decoration guarantee period, the decoration workers are unconditionally should be processed for the second time, and the final payment will be paid after processing.

  3. Anonymous users2024-01-22

    When laying floor tiles, the slope angle is not done, the wall is blistered, and the waterproof is not done? It depends on the contract, and the renovation company should be repaired.

  4. Anonymous users2024-01-21

    Don't give it first, the contract should have a lot of quality problems after decoration.

Related questions
3 answers2024-08-21

When making a restaurant, you must know about the cooking package.

7 answers2024-08-21

The door is crooked, it's stuck, first of all, you straighten the door, don't let it get stuck, and then lift the whole thing up, and there's a gap in the chute, and you can slide it down to the ground.

3 answers2024-08-21

Considering the secondary decoration, usually the water, electricity, weak electricity, and waterproofing are done well and thoughtfully to reduce unnecessary waste.

6 answers2024-08-21

If it is a wall, it is recommended to use wall materials, there are three commonly used now, one is paint (recommended master, Dufang, three trees environmental protection paint), one is wallpaper (there is no recommended brand, there is no large-scale manufacturer in China), and one is diatom mud (the new material is more hot and expensive, recommend Lanshe, Dr. Mud, etc.). >>>More