Integrated ceiling installation steps

Updated on Suspended ceilings 2024-08-03
3 answers
  1. Anonymous users2024-01-24

    The integrated ceiling is measured and then designed, and then installed according to the design drawings, the installation process is first up and then down, from one side to the other, you should ask a professional master to install, otherwise there will be danger.

  2. Anonymous users2024-01-23

    Install the angle line first, and install it step by step: boom, three eight bones, triangular bones, and buckle plates.

  3. Anonymous users2024-01-22

    It's better to find someone who understands and don't mess around with yourself.

Related questions
9 answers2024-08-03

58.com publishes posts to publicize and publicize.

2 answers2024-08-03

It is to first install the ceiling and then install the lamp, first of all, the line will be pre-buried, and then install the keel seal gypsum board, then scrape 888 putty to paint the wall, and finally install the lamps.

1 answers2024-08-03

Professional Approach:

The installation of the trimming line is basically fixed with glass glue or screws, which is not a special skill, and basically depends on proficiency (positioning first when trimming the edge). >>>More

3 answers2024-08-03

For the integrated ceiling, as long as your floor height allows, you can choose the ceiling, but the general integrated ceiling is not designed with a chandelier, which is not very coordinated, if you want to press the chandelier, you must set up a separate boom or bracket to fix, due to the large weight of the chandelier, in order to ensure safety.

3 answers2024-08-03

The price of the integrated ceiling is very large from cheap to expensive, but the price goes up and the quality must go up, so it depends on what you need.