What facilities should the developer have when the rough house is handed over?

Updated on Entrance door 2024-08-07
2 answers
  1. Anonymous users2024-01-24

    When the rough house is handed over, there is nothing, only windows and entrance doors. The clear water room is more white than the rough house. This is normal.

  2. Anonymous users2024-01-23

    Water interface, natural gas interface on the line.

Related questions
1 answers2024-08-07

It is unlikely to be a clearance check-out. At least not in one bedroom. >>>More

3 answers2024-08-07

Generally, what door is required to be indicated on the purchase contract, some are steel doors, some are anti-theft doors, there are many people who mistakenly regard steel doors as anti-theft doors, and some developers also write the brand. Doors and windows should be there.

2 answers2024-08-07

Didn't see the layout of your water pipes.

I can only make a few suggestions. >>>More

3 answers2024-08-07

Normal can be used, if you don't decorate, let the water flood a day before moving in, try it, and find the developer to rectify the problem. >>>More

3 answers2024-08-07

Now the new real estate is purchased by the developer, the installation of anti-theft doors, anti-theft doors are divided into A, B, C, D four levels according to their anti-theft levels, the corresponding anti-theft time limit is 30 minutes, 15 minutes, 10 minutes, 6 minutes. The measures to ensure the anti-theft performance are mainly reflected in the thickness of the steel plate, the internal filling and the lock, and the thickness of the door leaf has nothing to do with it, and the national standard is GB17565-2007.