-
Panel furniture: sliding table saw (15000), multi-row drill (30000), edge banding machine (10000), designer, machine operator. Panels (wood-based panels:
Particleboard, fiberboard, plywood), hardware: three-in-one connectors, wooden tenons, screws, slides, corner cups, etc., computer: CAD 3D design drawings, spray gun + air pump + painter (if veneer particleboard does not need this step), the rest is the market, the capital is 500,000 enough.
1 hydropower, 2 workers, 3 machines, 4 raw materials.
Do it secretly in the countryside first. >>>More
Whether you do a whole set or do light guide plates, or printing, or whatever, the price of the machine is different.
This is not something that can be explained in three or two sentences, but if you really need it, you can talk about it on Q.
You don't need to register, there are many such manufacturers in Chengdu. Because I deal with them every day.
To open an integrated ceiling processing plant, there is generally no need to produce edge keels and the like, because most of the edge keels are painted, and it is a production process and production line, which is more troublesome. This part can be commissioned for processing.