Is it okay to level the bathroom first and then tile it in a few months?

Updated on Bathroom 2024-08-04
1 answers
  1. Anonymous users2024-01-24

    From a technical point of view, there is no problem, just a reminder that you should pay attention to the humidity of the wall when applying tiles.

Related questions
2 answers2024-08-04

The causes of the problem are as follows:

Look at the picture The gap between the tiles is small, and the tiles may burst due to thermal expansion and contraction; >>>More

2 answers2024-08-04

The whole wall tile peeling off is caused by the construction party not in accordance with the specifications of the construction, which is a serious construction quality problem, and the main reasons are as follows: >>>More

5 answers2024-08-04

First do the bathroom and kitchen waterproofing, and then determine the horizontal elevation of each space according to the design requirements, and inlay the floor tiles according to the elevation, without leveling in advance.

1 answers2024-08-04

First, the grouting method.

For a small number of corners of hollow tiles, can be treated by grouting method: scrape the tile gaps at the corners and hollows, and fill them with cement mortar. This method can play some role in the hollowing of a small number of corner tiles on the ground. >>>More

2 answers2024-08-04

Bathroom waterproofing is not done well, not very easy to repair, to repair the tile from the inside to destroy, find a waterproof company grouting to see, reduce the damage area.