How to waterproof the new water pipe in my bathroom after smashing a piece

Updated on Bathroom 2024-08-14
3 answers
  1. Anonymous users2024-01-24

    First of all, this should be based on the size of the area you smashed, if it is just a small piece of tile, the area is not large, then you can consider partially re-waterproofing, but if the area of the smashing is relatively large, then for the sake of insurance, it is recommended to re-do all the waterproofing.

    Bathroom waterproofing, it is recommended to use kitchen and bathroom waterproof slurry, it is specially developed for the kitchen and bathroom room is easy to seep water Yin and Yang corners, pipe sanitary ware, floor drain periphery and other parts, special materials, more targeted, so the waterproof effect is also better and more durable.

    Of course, the standard construction is the guarantee of the waterproof effect, so whether it is the proportion of water added to the quick-setting repair mortar, or the proportion of the waterproof slurry, the thickness, height, and interval time of the construction are all paid special attention to, and only in this way can the waterproof effect be achieved.

  2. Anonymous users2024-01-23

    If the hole washing machine washes the hole, you can consider local waterproofing, and if you smash it, you need to re-waterproof the ground.

  3. Anonymous users2024-01-22

    Is it on the floor or on the wall? Try it with plugging spirit, the ground is more risky

Related questions
2 answers2024-08-14

The main pipeline developer is responsible, and the pipeline that changes the water is responsible for itself. However, if a quality assurance certificate is signed at that time, the person who installed the water pipe should be responsible.

1 answers2024-08-14

Bathroom for a brick does not need to do waterproof, but you change the brick process will be difficult to avoid the destruction of the waterproof layer, you must be careful, you take off the brick, the following brick layer has been hard, if you want to paste a new brick must shave off the brick layer, at this time waterproof is very easy to destroy, it is recommended that you change the brick do not shave the brick layer that has solidified below, to the building materials market to see if there is that kind of thin adhesive brick glue, be sure to scrape the brick under the glue, to prevent water seepage from the periphery of the brick in the future. Finally, the bricks are caulked around and must be embedded.

3 answers2024-08-14

The color of this contrast is not very good at home.

2 answers2024-08-14

If there is no hot water pipe, there must be wires underneath, I have encountered such a situation before, the electricity wall is heated, the resident said that there are no wires in the wall, and then the metal detector is used to detect that there are wires inside, and after smashing the wall, it is found that the wires inside are burned, and it is heated after the electricity is turned on.

2 answers2024-08-14

Summary. Method.

1. Re-paste the tiles, clean up the base layer, and then paint the wall to plug the leakage, and use tile glue or cement mortar to paste the tiles; >>>More