Can I not report the bathroom lock hinge during construction?

Updated on Bathroom 2024-08-23
2 answers
  1. Anonymous users2024-01-24

    The lotus leaf of the bathroom lock, this belongs to the hardware strong, I think the construction is also to be reported, because this is also a very important part.

  2. Anonymous users2024-01-23

    Bathroom lock hinges in the construction you do not need to report the construction inspection batch. However, you must report the acceptance record of the raw materials. In addition, it is necessary to verify the supplier's qualification certificate.

Related questions
1 answers2024-08-23

Absolutely. You can contact the lock changer or the seller who does the home furnishing business.

7 answers2024-08-23

Of course, this can be fixed with screws, so pay attention to it when you fix it, and don't be able to hang someone else's.

1 answers2024-08-23

Can be used on the bathroom floor, floor paint construction steps: first clean the ground (dust, oil, loose), and then brush 1-2 times of primer, each time between more than 3 hours, (humidity can not be greater than 80 degrees, humidity greater than 80 degrees need to be separated by 6 hours or more than a day of construction next time) more than 4 hours after drying, brush water-based paint 2-3 times, each time between more than 3 hours, more than 4 hours after drying brush topcoat 2-3 times, each time between more than 3 hours, 7 days to achieve the best It takes 7 days for you to touch the water (you can't soak in the water for a long time). >>>More

3 answers2024-08-23

Yes. It's not okay if it's too wet, so wait until it dries.

2 answers2024-08-23

There are also thresholds for doors to the roof, large pipe vents on the roof, and so on.