Bathroom waterproofing, detailed calculation formula what to add, what to multiply, and what to subt

Updated on Bathroom 2024-08-18
2 answers
  1. Anonymous users2024-01-24

    The detailed calculation formula: toilet waterproof area = (toilet perimeter - door width) floor area.

    refers to the height of the wall from the bottom chamfer; The perimeter of the bathroom is the total length of the four sides of the floor combined; The height is the recommended conventional height of the waterproof painting height of the bathroom set by the Ministry of State Institutions according to the height of the human body;

    Example: What is the waterproof area to be painted in a rectangular bathroom with a floor length of 4 meters, a width of 3 meters, and a door width of 100 centimeters?

    4X2+3X2-1) square meters.

    Leibons - home waterproofing expert.

  2. Anonymous users2024-01-23

    The waterproof area is done below the meter level, which is the conventional waterproof scale of the bathroom. Including the wall, the ground, the area is the perimeter of the wall multiplied by meters, plus the ground area, this is the waterproof area!

Related questions
1 answers2024-08-18

There is no formula, as long as the length and width of each wall and the size of the surface tiles are arranged, and the elements such as whether the surface tiles are parquet or not, there will be results.

2 answers2024-08-18

1.with a water repellent agent. First use waterproofing agent mixed with cement mortar to do it at the base of the kitchen or bathroom, and after it is dry, then use waterproofing agent mixed with cement ash to brush a layer on the surface layer for the first time, so that the main purpose is to plug the small holes produced after the first drying, and the root of the pipe should be carefully brushed. >>>More

2 answers2024-08-18

The horizontal projection area of the ground + the wall is generally 300mm high + the wall with a shower is generally 1800mm high.

2 answers2024-08-18

The more detailed the better, such as what to do in the first step, and the second >>>More

1 answers2024-08-18

Waterproofing is done 5 to 6 cm below the finished surface of the bathroom floor, the waterproof layer is paved with floor tiles, and the waterproof layer is on the four walls, turning up 30 cm.