What should I do to make paint in the bathroom?

Updated on Bathroom 2024-08-29
5 answers
  1. Anonymous users2024-01-24

    Bathroom brush waterproof paint process.

    1.Before construction, ensure that the construction site is clean and dry, and the waterproof coating should be coated with no omission, firmly combined with the base layer, no cracks, no bubbles, and no falling off. The coating height is consistent, and the thickness should meet the requirements of the product.

    Then start brushing the first waterproof paint requires more than millimeters, which cannot be decided by the number of passes. The pipe root and the corner of the wall are reinforced, and after the surface is dried at room temperature for 4h, then a large area is brushed and scraped, and there shall be no leakage and bubbling.

    2.Brush the waterproof paint a second time. Note the first.

    First, the second waterproof coating needs to have a certain time interval, and the second time can only be carried out after the first coating is dry, and the specific time depends on the coating. If the interval is too short, the waterproof effect will be greatly reduced. The façade is painted first, then the plane, and the direction of the next painting is perpendicular to the previous one.

    When the final coating film is semi-cured, the coarse sand particles are thrown to facilitate the combination with the cement mortar in the future. The waterproof layer on the ground should be painted 300 wide outside the bathroom door. The waterproof floor waterproof layer should be 200 above the ground, and the wall waterproof layer of the bathroom with shower should be 1800 above the ground.

    3.Lay a protective layer. In order to prevent the subsequent construction from damaging the waterproof layer, it is necessary to lay a protective layer on the surface of the waterproof coating. The protective layer should be completely covered with the waterproof layer, no omission, firmly combined with the base layer, no cracks, no bubbles, and no falling off.

    4.Closed water test. During the closed water test, the water at the highest point of the ground should not be less than 2 cm, and it should be stored for at least 24 hours, and it will be qualified only after observing that there is no leakage. If there is a leak, it needs to be redone, and it must not be negligent.

  2. Anonymous users2024-01-23

    1. The base layer is clean and dry;

    2. Apply the first waterproof coating (water-soluble or solvent-based);

    3. Lay the first layer of non-woven fabric to strengthen the carcass while it is wet, pay attention to flattening, and drive out all the bubbles.

    4. After drying and hardening one cloth, apply the second coat + strengthen the carcass for the second time;

    5. The second cloth and the second coating are dried and hardened and then applied to the third coating;

    6. After drying and hardening, it is handed over to press water;

    7. If you do two cloths and four coats, the last surface layer should be painted twice;

    8. After the pressurized water is qualified, the protective layer will be made and the pressurized water will be handed over;

    Attention must be paid to details in construction, water leakage is leakage at the corners and pipe roots, and large areas generally do not leak.

  3. Anonymous users2024-01-22

    It is still strongly recommended that the bathroom should not be painted, even if it is the kind of exterior wall paint, but because the bathroom has been disturbed by water vapor for a long time and is excessively humid, it will not take long and it is still easy to fall off. It really needs to be done, it is best to buy a shower room, put the shower room wall or tiled, and paint the wall in other places to distinguish dry and wet. But it will still keep the paint on the walls for not too long.

  4. Anonymous users2024-01-21

    with waterproof paint or exterior paint.

  5. Anonymous users2024-01-20

    Is there any paint in the bathroom? Doesn't the moisture go away?

Related questions
2 answers2024-08-29

Block the drain, release the water, generally store 3 to 4 cm of water, the water storage time is generally about 24 hours, and observe whether there is leakage under the board.

12 answers2024-08-29

The answer to the waterproof method of the bathroom is: 1. Brush the waterproof paint twice; 2. laying a protective layer; 3. Closed water test; 4. Grassroots cleaning, secondary water storage test. The precautions for bathroom waterproofing are to ensure that the construction site is clean and dry before construction, and the waterproof coating should be full, no omission, firmly combined with the base layer, no cracks, no bubbles, and no falling off. >>>More

5 answers2024-08-29

Nowadays, there are many small houses, and the bathrooms are not very large, so bathroom storage has become a big problem. Some bathrooms are only four or five square meters, and a washing machine is squeezed in, which makes it very inconvenient to feel that the last bathroom is bumpy and bumpy. >>>More

1 answers2024-08-29

First, the waterproofing was not done well at that time, and many owners asked the plasterer to do it when decorating, which led to a lot of negligence and inadequate details when decorating. Second, after the waterproofing is done, when the bricks are laid, the bathroom door stone is not blocked with a leak plugging treasure, and the water will seep to the outside. Third, after a long time, there are cracks in the floor slab, and the water seeps down. >>>More

1 answers2024-08-29

First of all, the ground has to be leveled, 30 cm from the ground wall tiles are also removed after leveling, to dry, two kinds of waterproofing: membrane, coating, if you use membrane, it is best to use EPDM waterproof membrane, if you use paint, it is best to use rubber modified asphalt waterproof coating, the ground and wall are done together, after doing it is like a basin, it is best to paint three times with paint, the main part is the floor drain pipe mouth, toilet pipe mouth, the ground and the wall joint, the weak part of the ground, do it carefully clean the pipe mouth with a toothbrush, Rinse while brushing, clean with waterproof cement carefully wipe the ground and the joint of the pipe mouth, the water does not leak inside the best to add some asbestos powder, after thoroughly drying and the ground together with the overall waterproof, the toilet fixed wire should be laid first, more than one centimeter from the ground The mouth of the screw is wrapped with masking paper and do not stain the waterproof coating, the following part is also brushed with the ground with waterproof paint to prevent the water from seeping down the fixed wire in the future, and you can put the water after drying, soak for 48 hours, the water should be 10 cm deep, otherwise it will be tried in vain, You said that the plumbing pipeline in the seal before taking a few photos, in case there is a problem in the future can check the location, with the high grade cement all sealed and leveled, the key is that the cement must not be bought fake, otherwise it is also done in vain, good cement looks blue after drying, high density, high hardness, high strength, not easy to leak, do not use white cement to make up the seams after sticking the floor tiles, you go to buy a few bottles of Taimao brand plastic steel clay, but also to prevent not to buy fakes, floor tile joints, wall corner joints, etc. are all made up with plastic steel soil, if you do this, There is absolutely no possibility of a water leak in 10 years, unless the house settles and causes a slight crack in the ground, and then raise the problem. I wish you success! >>>More