High rise house, the gas company in the kitchen has a good eye, but has not yet worn the pipe yet, y

Updated on Kitchen 2024-08-14
2 answers
  1. Anonymous users2024-01-24

    Or wait, it's best to wait until the pipes are installed before getting it, or the installed pipes are very simple, you can also install the ceiling keel first, and don't get the board first.

  2. Anonymous users2024-01-23

    Don't rush just yet, wait until everything is ready.

Related questions
6 answers2024-08-14

Choose your own spot. In: Southeast, and then there are professionals to install it on the line. Safety first. The labor cost is also not high. Health industry in the new era of socialism. This can be had. Study hard, work hard, and make money to be better.

3 answers2024-08-14

Natural gas mains should be designed in indoor corridors and kitchens, mainly to prevent freezing in winter and to prevent clogging at the shortest distance from branch pipes. Designed outdoors in an area where the minimum temperature cannot be lower than 0 degrees Celsius.

1 answers2024-08-14

Yes, you can install an exhaust fan or range hood.

2 answers2024-08-14

If this pipe is a "public pipe", that is, a common gas supply pipe for the whole building (which is usually the case), there must be gas in it. The shutdown of the house is just the closure of the air supply valve that separates from this pipe into the house.

8 answers2024-08-14

Natural gas is fine as long as it doesn't leak, and most of the natural gas meters and pipes are now in the kitchen. Feel free to use it.