In CAD, do you want to paint the door for the floor bricks, and do you want to paint the ceiling?

Updated on Suspended ceilings 2024-08-15
4 answers
  1. Anonymous users2024-01-24

    The floor is paved with bricks and suspended ceilings, as long as they are represented by lines, and there is no need to draw the door.

  2. Anonymous users2024-01-23

    Doors are generally drawn in every diagram, but the door number is only required in a few diagrams.

  3. Anonymous users2024-01-22

    The floor plan should have two lines for the door and ceiling, and two lines for laying bricks.

  4. Anonymous users2024-01-21

    There is no need to draw the paving, just mark the position of the ceiling.

Related questions
1 answers2024-08-15

The balcony can be pasted with floor tiles, the frosted surface is fine, and the wall is not too necessary.

1 answers2024-08-15

It doesn't have to be powdered to the end, there is a foot line position, and you can leave 20 cm.

5 answers2024-08-15

The blanket is covered with a quilt; Wool carpets are laid on the ground. So don't lay the blanket on the floor. >>>More

3 answers2024-08-15

Is there a suspended ceiling? If there is, for the sake of aesthetics, it will be pasted to the position of the ceiling, if there is no ceiling, do not pay attention to aesthetics, pay attention to practicality, and paste one meter five on it.

2 answers2024-08-15

In fact, there is no need to put bricks in the restaurant. It's better to paste a wallpaper on it, of course, this technical requirement is not very high, if the restaurant wants to paste tiles, the first thing is to confirm whether the waterproof is done, and then check the position of the switch socket, because there is no chance to regret the bricks. You must also be careful when picking bricks.