After the bathroom floor tiles were paved, it was found that the floor drain and angle were not suit

Updated on Bathroom 2024-08-19
5 answers
  1. Anonymous users2024-01-24

    There is a way to use a cutting machine to open a small hole in the gap of the floor tiles, only the seam of the blade can be cut, and the floor drain can be cut from the stagnant water, the front is high and the back is low.

  2. Anonymous users2024-01-23

    Definitely not, those close to the floor drain knock off the shop, or shovel it all, the cost has to be paid by the worker, at least half, because it is her responsibility, must be done well, otherwise it will be very troublesome in the future.

  3. Anonymous users2024-01-22

    You can only pry the tiles and re-pave, the floor drain must be at the lowest point, 1-2mm lower than the tile, pay attention to waterproofing.

  4. Anonymous users2024-01-21

    It is only possible to pry up the tiles and re-lay the inclination.

  5. Anonymous users2024-01-20

    One of the best ways to do this is to lay another layer of bricks on top.

Related questions
4 answers2024-08-19

After laying the floor tiles, install the toilet, and find that the ground is uneven, it is normal, because the bathroom floor must be drained, there is a certain slope, and the treatment method is to use cement mortar to pave and install the toilet.

1 answers2024-08-19

Just ask the master bricklayer.

The floor drain should be anti-odor, insect-proof, anti-blockage, and anti-overflow, and you can understand the very core floor drain designed with the principle of anti-gravity. >>>More

4 answers2024-08-19

It is estimated that it is a water leakage, because the PVC pipe is not likely to condense under normal circumstances, because the temperature difference between the surface of the PVC pipe and the general atmosphere is generally not too large, and there are almost no PVC pipes for insulation. >>>More

1 answers2024-08-19

It's all like that. It's good to finish laying the tiles. When laying tiles, the master will find all the tiles.

1 answers2024-08-19

Hello standard door stone and the floor tiles on the outside ground should be flat, the interface must be mechanically cut the façade corresponding, your interface is not ideal is estimated to be no corresponding generation, if the door brick is marble, you can use the corresponding marble glue to fill the polish, the effect is good. If the floor tiles are all tiles, they cannot be repaired, so you can discuss with the construction staff to replace them.