How to do glass balcony inspection batch quality acceptance record

Updated on Balcony 2024-08-29
1 answers
  1. Anonymous users2024-01-24

    In accordance with the provisions of the "Regulations on the Management of Building Safety Glass" (Fagai Run [2003] No. 2116).

Related questions
1 answers2024-08-29

The inspection and assessment records of the construction unit can be filled in to meet the requirements.

1 answers2024-08-29

According to the normal housing construction project of the sub-project to do the inspection batch.

5 answers2024-08-29

Make a 30 50 mm high water retaining strip (ridge) at the door of the bathroom with yellow clay, low-grade cement mortar and other materials, and block the floor drain tightly. Water is discharged from the ground to form a small pool with a depth of 20 to 30 mm. After 24 hours of water storage, no leakage is qualified.

1 answers2024-08-29

Add blackout curtains to the glass windows, or paste car film. The former is completely shading but affects the lighting, and the latter is shading deviation but has sunlight to reveal.

1 answers2024-08-29

You try to spread a layer of sponge on the top of the cap, it should have a silencing effect.