The floor was leaking, and the inspection found that the inspection port of the kitchen sewer pipe w

Updated on Kitchen 2024-08-14
4 answers
  1. Anonymous users2024-01-24

    Such a renovation company is too irresponsible to make such a low-level mistake.

    In accordance with the relevant provisions of the state, the warranty period of the water and electricity concealment project of the home improvement project shall not be less than 3 years, and the landlord can find the local industrial and commercial consumer association to mediate.

    This kind of maintenance work should not be much, it will not cost too much money, it is a troublesome point, and it should not be difficult to solve it with the intervention of a third party.

  2. Anonymous users2024-01-23

    For civil disputes, go to the police to deal with them.

  3. Anonymous users2024-01-22

    It must be a cutting corners in the decoration, it's so irresponsible.

  4. Anonymous users2024-01-21

    The contract you signed has a shelf life, if within the shelf life, as long as the official seal is issued by the decoration company, and within the life limit, all the costs should be borne by the decoration company. If the decoration company refuses to bear it, it can take legal measures or complain to the decoration association.

Related questions
1 answers2024-08-14

If you stipulate that cigarettes cannot be stored in the kitchen. >>>More

3 answers2024-08-14

The farthest end of the horizontal pipe part of your own house is a floor drain or wash basin, you can not have an inspection port, the first floor of the riser must be set up, and a multi-layer interval can be set up on several floors. There is no need for checkpoints.

6 answers2024-08-14

This is the upstairs waterproofing is not done well, and your family has no way to deal with it, so you can only go upstairs to see and negotiate to deal with this problem.

2 answers2024-08-14

Find a professional waterproof personnel to do a good job of waterproofing engineering!

3 answers2024-08-14

You changed the public part, and you have to go through very complicated procedures to change it, and you are the first to violate the rules. The deposit is collected for this type of loss. >>>More