How to make the toilet waterproof after remodeling

Updated on Toilets 2024-08-07
3 answers
  1. Anonymous users2024-01-24

    The toilet can't be waterproofed after remodeling. The correct way is to treat the original ground and brush it with polyurethane. As for the SBS and waterproof coatings mentioned above, they cannot be used for waterproofing the toilet floor.

  2. Anonymous users2024-01-23

    There are many ways to do waterproofing normally.

    1. SBS coil, with some cement, 801 glue, relatively cheap, the pass is tied well, flat and aligned, and it is enough for normal household use. (The most commonly used method on the street).

    2. Cement and glass water encryption agent. (The cheapest way to do it yourself is a bit unsafe.) )

    3. Polyurethane, imported and domestic, anyway, it is necessary to brush a thick layer, and the price is not expensive (the most expensive method).

    4. Waterproof coating, manufacturer construction, requires the wall and ground to be smooth and clean (the most troublesome method in the early stage).

  3. Anonymous users2024-01-22

    Polyurethane, Sika and SBS are fine, but waterproof coatings are not good.

Related questions
3 answers2024-08-07

If it is not open-air, you can use polypropylene for waterproofing, and if it is open-air, it is recommended to use SBS waterproofing membrane.

2 answers2024-08-07

Dig a hole. Cut on the bricks. Plastered with cement plaster. The diameter of the protrusion is 15 cm, and the length of the pipe is 2 meters. This is called a septic tank. The pit is 2 meters deep.

2 answers2024-08-07

Hello. The waterproof construction process of the toilet is generally as follows: first, the floor is leveled with cement mortar, and the surface impurities such as some particles and dust are cleaned after drying. >>>More

15 answers2024-08-07

Hello, Apple Decoration will answer the toilet waterproof construction process for you:

14 answers2024-08-07

How do you make a bathroom waterproof? Let's find out.

Bathroom waterproofing needs to be painted with waterproof paint twice, the first waterproof coating needs to ensure that it is firmly combined with the base layer, and then brush the second time after the first paint is dry, and then carry out a closed water experiment after completing the brushing, and observe that there is no leakage before it is completed. >>>More