The bathroom needs to be replaced with a floor drain, which is 4 square meters large, and the origin

Updated on Bathroom 2024-08-27
8 answers
  1. Anonymous users2024-01-24

    It takes about 1 day to dismantle the old bricks, and it is very fast to do waterproofing, but it is necessary to test the water (soaked in water) for 24 hours without water and water leakage before the bricks can be re-laid; It takes less than 1 day to re-lay the bricks (4 square meters), and it takes a total of 3 days and 2 work.

  2. Anonymous users2024-01-23

    If you are looking for a contractor and materials, it is very cost-effective according to the square meter.

  3. Anonymous users2024-01-22

    Whether it's only floor tiles or wall tiles, if it's only a ground project, it can be done in about a week!

  4. Anonymous users2024-01-21

    This landlord, you can make your problem clear, and someone can help you figure out how much it is. And I don't understand why you want to get a few jobs? Contractor?

    Or the owner? For example, what kind of brick is prying, what kind of waterproof should be done, and what brick is laid, it is best to have a practice. It generally takes two jobs to pry bricks a day, not two jobs, three jobs, and a week should be done.

  5. Anonymous users2024-01-20

    It takes about 3 days for a worker to work.

  6. Anonymous users2024-01-19

    The work is not cost-effective, if the unit price you give is low, he will do it slower, and give him how much he will give him according to the market price of one square.

  7. Anonymous users2024-01-18

    One bricklayer is done, 2-3 workers are enough.

    According to the theory of "looking at the money", such a small area is generally not calculated by the square, and usually takes the package project, including the wall part of the waterproof and the wall tile and floor tile, about 700 pieces.

  8. Anonymous users2024-01-17

    It is better not to calculate the home decoration according to the work, and directly let the workers see how much it is better.

Related questions
1 answers2024-08-27

How much does it cost to renovate a neoclassical 4 square meter bathroomBathroom decoration stocks, which also need decoration standards... >>>More

4 answers2024-08-27

Floor drain is not very conspicuous a small piece of hardware, but it plays a very role in it, I don't know if you have encountered the problem of floor drain smell, this is a headache, generally as long as the old floor drain can be replaced to solve the problem, in fact, they can also be replaced and installed, so how to change the floor drain in the bathroom, what are the processes of floor drain installation? >>>More

5 answers2024-08-27

Ceiling 1500 yuan "integrated ceiling", cabinet 2000 yuan, "middle and upper" wall and floor tiles 5000 yuan hydropower renovation 1500 yuan total: 10000 yuan, this is the most economical, there is a low price of about 8000, or luxury about 25000, hehe it depends on your economy.

2 answers2024-08-27

Straight... L-shaped... It depends on the width of your bathroom...

2 answers2024-08-27

Choose 80 yuan 1 square tile of tiles, assuming that the height of the room is meters, aluminum alloy gusset ceiling to meters. If it is all-inclusive, it is about 8000-10,000 yuan.