-
It is not possible according to the fire regulations. The kitchen is a high-temperature and flammable area, and it is easy to have problems with the cables.
Do you mean that the cable tray goes through the kitchen or the cable goes through the kitchen into the tray?
In addition to the mineral insulated cables in the ceiling, the rest should have fire protection measures. Look at the high and building regulations.
If the conditions are really limited, the roof of the hotel kitchen can also be laid with a bridge, but at least it is integrally sealed. At the same time, the cables laid must be resistant to high temperature and corrosion, because oil has a corrosive effect on plastics.
As the main contractor: technical management is not in place, that is, there is no technical disclosure. >>>More
Summary. Construction engineering: description of over-elevation fee for high-rise buildings and rules for calculating engineering quantities. >>>More