When the house is handed over, the toilet floor tiles have been paved, and it should be re paved

Updated on Toilets 2024-08-12
1 answers
  1. Anonymous users2024-01-24

    Do the water storage experiment, the time is 24 hours, see if the leakage is not leaked, do not re-lay if there is no leakage.

Related questions
3 answers2024-08-12

The center position is still replaced, so as not to match the same color bricks in the future, the corners or places where the furniture is placed can be mended with marble glue, or ceramic glue, it doesn't matter if you polish it.

1 answers2024-08-12

If the cabinet meets the requirements, don't dismantle it. >>>More

1 answers2024-08-12

Yes, don't you like that floor tile? What questions and answers are there in the pants, if you want to pave from the new one, it is more troublesome, and you have to warp up the previous floor tiles from the new one to disturb the pure paving.

2 answers2024-08-12

The easiest way is to get out the floor tile where you opened the floor drain and re-lay the floor drain.