How many water pipes are generally needed for two bathrooms in a 120 square house

Updated on Bathroom 2024-08-05
1 answers
  1. Anonymous users2024-01-24

    Look what structure you are! If it is a mix-in structure. Two floors of words! After the foundation is about 2 tons, each layer of powder wall needs 5 tons, about 12-15 tons! If it's a two-story structure!

Related questions
2 answers2024-08-05

About 360 square meters of paint (including ceiling and wall).

2 answers2024-08-05

The general labor cost of tile pasting is 30 40 yuan per square meter of ground, 35 45 square meters of wall, and the total price is the total price according to the actual construction completion area.

2 answers2024-08-05

It is not practical to change two bathrooms in the same bathroom, because there is not enough space. Adding a bathroom not only requires the cooperation of the next layer of people (which is generally not cooperative), but also has the taboo of feng shui. It is recommended that the current pattern be maintained. >>>More

1 answers2024-08-05

Which wall in the master bedroom? Be clear. Is this for two bathrooms? >>>More

4 answers2024-08-05

If it's a villa, it's cheaper.

If it is a commercial house, it is expensive. >>>More