Has your bathroom been waterproofed before? What material is used for waterproofing? What is the height of the application?
Now the bathroom is leaking, first of all, you need to find the cause of the leakage, whether the pipe in the wall is ruptured and causes the leakage, or the quality of the original waterproof layer in the bathroom is problematic, and then re-use the mortar waterproofing agent to do waterproofing according to the actual situation. It is not recommended to do waterproofing on the tile, because the waterproof material is generally done on the cement-based surface, and it is necessary to do a good job of the waterproof layer first, and then paste the tile, and there is no actual waterproof effect on the tile.
-
Waterproofing should also be done first, after doing the test of the water and then tiling, even if there is a better material waterproof after pasting, it is easy to destroy.
-
Hello, it is recommended to use a sewing agent to do a little more treatment, house, doctor.
-
It should have been waterproof at first.
I can't understand your statement and understand exactly what you mean! >>>More
IT IS POSSIBLE THAT THE WATERPROOF LAYER IS NOT DONE WELL, AND THE WATERPROOF LAYER SHOULD EXTEND FROM THE GROUND TO THE WALL, 250MM ABOVE THE GROUND. >>>More
I can do waterproofing! The next time you do waterproofing, you can directly pry open the tiles and discharge the stagnant water from the caisson to do waterproofing again! Hope it helps!
There is no need to knock on the tiles at all, and it can be repaired very cheaply, and you can build it yourself, it is very simple, you can know the private message me,
Bathroom tiles have been pasted with water leakage, first determine the location and cause of the leakage, the water pipe first pressure to see if the leakage is not leaking, it may be a waterproof problem, or it may be the main road leakage, check one by one. If the waterproofing is not done well, it can only be smashed the tiles, and the waterproofing is done from the new, and the closed water test is done to ensure that there is no leakage, and then the bricks are laid from the new.