Brick and concrete building, the balcony has to be built at the bottom of the secondary structural b

Updated on Balcony 2024-08-18
2 answers
  1. Anonymous users2024-01-24

    It's not very clear how to build it flat.

  2. Anonymous users2024-01-23

    Strictly speaking, no, the main body acceptance is based on the design drawings, and you have to construct according to the drawings

Related questions
2 answers2024-08-18

This beam is not a secondary structure, and it is together with the cast-in-place floor slab, which will cause the slab to crack after dismantling.

3 answers2024-08-18

You're not a brick-concrete structure, it's a frame structure, and the wall is built at the back, and you have to lay bricks on top of it, and then paint it.

1 answers2024-08-18

The secondary structure does not include balcony railings, only balconies and wall columns.

2 answers2024-08-18

If you want to decorate the balcony, there are a lot of balcony decoration renderings on the decoration gallery network, choose your favorite style, and you will know how to decorate.

2 answers2024-08-18

The cantilever beam extends into the corresponding load-bearing wall at least twice the length of the cantilever beam, so as to ensure the load-bearing capacity of the structure and the structural safety.