Stick the floor tiles or wall tiles first, and the ceiling, which of the three should be done first?

Updated on Suspended ceilings 2024-08-04
2 answers
  1. Anonymous users2024-01-24

    The order is suspended ceilings, wall tiles, floor tiles.

  2. Anonymous users2024-01-23

    floor tiles, wall tiles, suspended ceilings.

Related questions
2 answers2024-08-04

Stick the floor tiles first, the kitchen is a more humid space, first paste the floor tiles and then press the floor tiles with the wall tiles to avoid the emergence of water flowing out with the gaps in the floor tiles and breeding bacteria.

2 answers2024-08-04

Paste the wall tiles first, but the bottom row needs to wait for the floor tiles to be pasted, and then lay the bottom row of the wall.

3 answers2024-08-04

There are a lot of decoration steps involved in decoration, and the most common problem is to make the ceiling or lay the floor tiles first. Let's take a closer look. If it is the ceiling of the kitchen and bathroom, it must be paved with bricks first, because the wall tiles and cement have a certain thickness, and the board of the ceiling should also be close to the tiles, otherwise the gaps will be ugly, and the buckle plate must be fixed to the wall tiles first, and then the ceiling can be suspended.

3 answers2024-08-04

Lay the floor tiles first, but first pave the floor tiles, the floor tiles are laid for at least a period of time after the paving is idle, the bricks can not be stepped on, the workers can not be asked to pave the wall tiles, if it is not dry and solid, the floor tiles are uneven. And if you stick the floor tiles first, there will be cement and sand falling on the floor tiles when the wall tiles are pasted, and the hardness of the sand is large, and the surface of the floor tiles will be scratched during construction; In addition, it is not easy to do hygiene; After the floor tiles are applied, the floor drain is opened. The cement slurry flow is easy to enter the floor drain. >>>More

5 answers2024-08-04

Most of them are first attached to the floor tiles, and then wrapped in the protection of the living room ceiling, some are worried about the wear and tear of the floor tiles, so the ceiling is suspended first. Generally, if the roof of the kitchen and bathroom is to paste the floor tiles and wall tiles, and the paint sprayed in the living room is finished, then the kitchen and bathroom ceiling should be made, and then the cabinet and bathroom.