Should clay bricks be laid on the anti beam of the bathroom floor before the aerated block can be bu

Updated on Bathroom 2024-08-11
1 answers
  1. Anonymous users2024-01-24

    When the masonry around the bathroom is used, it is required to have a concrete platform with a height of 200 meters and a wall thickness. Lightweight blocks can be built directly on top.

Related questions
7 answers2024-08-11

What do you know? After the ground waterproofing is completed, when the wall tiles are pasted again, the braces may pierce the ground waterproofing, and personnel may also destroy the ground waterproofing when they move around.

2 answers2024-08-11

It can reduce a certain amount of noise, and filling the gap between the brick and the sewer pipe with styrofoam can indeed reduce some of the noise, but it will have a certain effect.

2 answers2024-08-11

Summary. Hello, bathroom decoration should first be waterproof on the ground, after the waterproofing is qualified, the first should be pasted with floor tiles, and then with wall tiles. FYI. >>>More

4 answers2024-08-11

On the contrary, first do the flooring, and then do the waterproofing. >>>More

1 answers2024-08-11

Hello standard door stone and the floor tiles on the outside ground should be flat, the interface must be mechanically cut the façade corresponding, your interface is not ideal is estimated to be no corresponding generation, if the door brick is marble, you can use the corresponding marble glue to fill the polish, the effect is good. If the floor tiles are all tiles, they cannot be repaired, so you can discuss with the construction staff to replace them.