Look at the indoor temperature of your house, you need to do it if the indoor temperature is low, and you don't need to do it when the indoor temperature is high.
meters is the floor elevation. Calculate the height of the hanger along the lower skin of the plate and then subtract the hanger. How can the bottom of the board be installed? There is insulation at the bottom of the beam, and the thickness of the insulation layer should also be considered.
Cold water PP-R pipe bracket spacing.
OD DN 20 25 32 40 50 63 75 90 110 160 >>>More
Verify building drawings. If the meter is the floor elevation, it is calculated along the skin under the slab. If it is not a floor level, it is a horizontal pipe level. The manager is what the landlord understands. >>>More
Hello! It is like this, the general burial of water pipes is: first, buried; the second wall; The third is the suspended ceiling. But no matter how to specialize in the burial method, as long as it is buried, you must choose a brand with excellent quality. So that you can guarantee your quality. >>>More
Depending on the situation, PPR pipes are not needed for normal and galvanized steel pipes are needed. Rationale: >>>More