How much does it cost to build a stove in a 3 square meter kitchen, with floor tiles and wall tiles?

Updated on Kitchen 2024-08-06
2 answers
  1. Anonymous users2024-01-24

    When choosing floor tiles, it is important to consider the following aspects: First, it depends on the brand. Only well-known brands of floor tiles, the quality of their building materials can meet the national standards, and the content of harmful substances can be within a safe range.

    Second, it depends on its anti-pollution ability, if the family is very busy and can only clean once in two or three days, then choose the one with better anti-pollution ability. Third, if there are elderly people and children at home, you must do a slip resistance test when purchasing.

    Specifically, the selection of floor tiles can start from the following aspects:

    1.To see if the color of the tile is pure. Mainly observe whether the color of the back of the tile is uniform and consistent.

    2.It is necessary to observe whether the particles of the cross-section of the tile are fine. The cross-section here does not refer to the cutting surface around the tile, but to the fracture of the tile fragment.

    Generally speaking, the fracture is fine, hard and brittle, and the color is the same. Because the ceramic tiles with fine particles have strong waterproof ability, while the tiles with large particles are easy to soak in moisture, which affects the quality.

    3.Pay attention to the thickness of the glaze layer. The thickness of the glaze layer is the thickness of the cross-section of the glaze. Glaze is the most expensive material in the cost of ceramic tiles, and the thicker the glaze, the better the quality.

    4.To listen. Tap the tile to pay attention to whether the sound is crisp, such as the sound is clear and pleasant, such as the sound is dull, it is inferior.

    5.Test the waters. Consumers can pour some water on the back of the tile and pay attention to how quickly the tile absorbs water. After a few minutes, see if the marks left by the water on the front are obvious. The density of tiles that infiltrate slowly after the water disperses is large, and the marks left by the water are not obvious, so they are regarded as the top grade.

    6.Warp. Take two bricks back to back and face to face to see if they can be in close contact, and there is no phenomenon that the gap is too large to judge whether there is warping.

    7.Infiltration. Find ink to apply to the surface for 1 hour and then scrub to see if there are traces, no traces are good bricks, and those that have infiltration are resolutely not selected.

  2. Anonymous users2024-01-23

    If the cooktop is connected to the wall, then the cooktop should be built first so that the cooktop has a "bonded" surface to the wall. Moreover, if you build the stove first and then paste the tiles, the tiles on the wall will not be polluted, the cohesion is better, and some tiles will be saved.

    If you have any questions about the above, you can continue to ask; If you agree with me, please click [For Satisfaction] in time.

    Your click is the motivation for me to continue answering the question. It is not easy to answer the question, please understand! ★

Related questions
3 answers2024-08-06

Tile tile per flat about 15, scrape white per flat about 12 (package cleaning worker). Toilet, the general foundation of the water inlet sewer is done. About 30 yuan. It is to fix it and connect it to the water inlet pipe. Simple.

2 answers2024-08-06

Stick the floor tiles first, the kitchen is a more humid space, first paste the floor tiles and then press the floor tiles with the wall tiles to avoid the emergence of water flowing out with the gaps in the floor tiles and breeding bacteria.

3 answers2024-08-06

Lay the floor tiles first, but first pave the floor tiles, the floor tiles are laid for at least a period of time after the paving is idle, the bricks can not be stepped on, the workers can not be asked to pave the wall tiles, if it is not dry and solid, the floor tiles are uneven. And if you stick the floor tiles first, there will be cement and sand falling on the floor tiles when the wall tiles are pasted, and the hardness of the sand is large, and the surface of the floor tiles will be scratched during construction; In addition, it is not easy to do hygiene; After the floor tiles are applied, the floor drain is opened. The cement slurry flow is easy to enter the floor drain. >>>More

1 answers2024-08-06

If you change the wiring in your house and change the heating, it will take 2-3 days, which is cost-effective per day, and now the water and electricity are about 150 a day.

2 answers2024-08-06

The kitchen is three square meters, and you can also have a ceiling, just choose some integrated ceilings.