The floor of the bathroom is 10 cm higher than before due to the squatting toilet, and now the groun

Updated on Bathroom 2024-08-31
2 answers
  1. Anonymous users2024-01-24

    Rice? So low? It's too low to make a suspended ceiling. Generally, the bathroom should be more than a meter after the ceiling is done. I doubt you're doing it wrong.

  2. Anonymous users2024-01-23

    Put the squatting toilet above the ceiling concave piece.

Related questions
3 answers2024-08-31

1. Laminate flooring, the room must be leveled, otherwise the floor will be deformed in the future and there will be noise; 2. The door stone (threshold stone) is used between the bathroom and the hall, the kitchen and the hall, etc., which is mainly used to block water, and there may be a little small step; For reference;

4 answers2024-08-31

It depends on whether the water pipe is installed openly or concealed. >>>More

2 answers2024-08-31

The bathroom can be designed with two squatting positions, provided that the space is large enough. >>>More

2 answers2024-08-31

Hello: The reservation in the early stage is long, and the long part is OK according to the actual installation.

3 answers2024-08-31

It's very simple, buy cans of putty (putty) in the building materials market and fill the gaps.