How to deal with water seepage at the floor tiles and waterproof layer in the bathroom? Urgent! Urge

Updated on Bathroom 2024-08-04
11 answers
  1. Anonymous users2024-01-24

    Waterproof glue can be used. There are many kinds of plugging agents on the market, so you can go to a building materials store and ask about the features and effects and weigh them yourself. It is best to fix all the suspicious gaps in the floor tiles.

  2. Anonymous users2024-01-23

    No, you have to find a professional waterproof worker to do it.

  3. Anonymous users2024-01-22

    If you can't find the dew point in the bathroom and don't want to damage the floor tiles on a large scale, the best way is to use the blind spot plugging method. First, it is necessary to determine the scope of leakage with a leakage inspector based on experience, and then take the way of grouting to carry out it. We have.

    With more than 30 years of experience in the reinforcement construction of waterproof and leakage plugging structures, we provide free professional technical consultation on concrete waterproof leakage water repair, and introduce the performance of plugging materials. Eliminate the trouble of repairing today, leaking tomorrow, repairing every year, and leaking every year.

  4. Anonymous users2024-01-21

    This problem appeared in 09 years, and I reappeared in 12 years, can the decoration workers call them "masters". It's infuriating!

  5. Anonymous users2024-01-20

    Knock off the floor tiles and redo a layer of waterproofing, and other methods treat the symptoms but not the root cause, (although this is more troublesome, but the most effective way).

  6. Anonymous users2024-01-19

    Waterproof adhesive is not a professional waterproof material, and it has a short lifespan.

    It is recommended to use waterproof paint, fill the joints of the tiles, or use caulk with good waterproof properties.

    Prevent water from penetrating under the floor.

  7. Anonymous users2024-01-18

    Reinstall a stone at the door of the bathroom.

    Glue the waterproof adhesive between the doorway stone and the ground, so there will be no problems!

  8. Anonymous users2024-01-17

    1.The waterproof glue is only a temporary plugging leak, and cannot be used for waterproofing, and the waterproof glue generally has a strength, and this strength will disappear after a few months, and the waterproof effect can also be imagined.

    2.If the waterproof layer is damaged, it is better to re-do the waterproofing, although it is very troublesome to knock off the tiles, but this is a one-and-done method.

    3.If it is a paint and membrane, it cannot be applied on a wet base surface, otherwise it is easy to bulge and two skins, so it is best to use a mortar waterproofing agent (such as Lauyer mortar waterproofing agent) that can be applied on a wet base surface

    4.The best solution is to re-do the waterproofing, so as not to leak more troublesomely in the future.

  9. Anonymous users2024-01-16

    There is no salvation. Once the waterproof layer is damaged, it cannot be repaired. I had to do it all over again. The supplement is only temporary. It won't take long for the most important part of a house to be renovated is the water and electricity part. Can't be sloppy.

    When doing ground waterproofing, the live sinking tank should be swept clean, and the corners and corners should be poured into an arc first. It is also necessary to do secondary drainage, and when brushing, it is necessary to pay attention to the balance of the brush, not a small hole. Brush to the corner of the wall 10 cm, backfill before paving the floor tiles to brush one more waterproof, then pave the floor tiles, and the wall should also be brushed waterproof, at least meters high.

    In this case, you can rest assured. Gonghe is quite big, but I didn't do it, otherwise it would stink.

  10. Anonymous users2024-01-15

    This happens from time to time. The reason is that the shape of the waterproof layer is not done well, and there is no drainage eye. (At the drain outlet, it is usually necessary to leave a small eye on the waterproof layer to drain the water when the water is stored on the waterproof layer, which is a backup practice.)

    In fact, when sticking to the floor tiles, it should be on the back of the floor tiles, with waterproof mortar as the final fixed brick of the plain cement slurry, so that the water on the surface of the floor tiles will not easily enter the top of the waterproof layer, so that the process will not be more years later, the bathroom will not have a peculiar smell) In the case of a wooden floor outside the bathroom, it is required that the waterproof door of the bathroom should be handled well. That is, a high platform should be made at the entrance (just like the waterproof dam by the river), and the water on the waterproof layer should be blocked on the ground of the bathroom. This is a foolproof approach.

    It's just that the experience is not enough, and the process is not in place.

    Hit waterproof glue at the junction of floor tiles and waterproofing layer? That's a joke. That's what it is!

    As the friend upstairs said, replacing the door stone and retreating the waterproofing of this part is the fundamental solution.

  11. Anonymous users2024-01-14

    This is not allowed, only temporarily.

Related questions
10 answers2024-08-04

There is a leaky and moldy shop on TAOBAO WANG, which focuses on allowing family users to do it themselves. >>>More

10 answers2024-08-04

1. Inspect and accept the appearance, variety, specification, packaging, size and quantity of materials, and form corresponding acceptance records. >>>More

1 answers2024-08-04

The waterproof layer of the bathroom is not less than 300mm wide on the outside of the door.

3 answers2024-08-04

The tide is already a serious leak, and if there is no large amount of water and it will be wet, it must be a serious leak. Go and check the water and sewer pipes.

3 answers2024-08-04

It's normal, which is not like this, if you don't want to have worries, you can only wet pave the floor tiles, before putting the sill board, you must do the water retaining strip and the bathroom floor is level, do waterproof, and finally put the sill board with wet ash