2 answers
  1. Anonymous users2024-01-24

    Floor - after the ground is leveled.

    After the foundation of the wooden door - the door sleeve is completed, the manufacturer is notified of the on-site measuring tape, the construction period is about 25 days, the floor is laid after the completion - the door and door sleeve are installed.

    Lighting - the top is finished with latex paint.

    Sanitary ware - bathroom wall and floor are completed.

    Security door - installation needs to be completed before ground leveling (sand, cement, tiles and other heavy materials enter the site).

  2. Anonymous users2024-01-23

    The interior painting is over, the floor is laid, the floor is finished, the furniture, then the lamps are installed, and finally the protective layer of the security door is removed.

Related questions
2 answers2024-08-14

Now I generally buy parquet, which is easier to take care of than solid wood, and it is not easy to deform without solid wood!

1 answers2024-08-14

Due to the different geographical locations of cities across the country, the local equilibrium moisture content is different, and professional sales personnel should be consulted when choosing, so that you can buy flooring precautions that are balanced with the equilibrium moisture content. >>>More

1 answers2024-08-14

It is better to go directly to the physical store to buy it, although the price will be different, but once the quality of the product has a problem, after-sales service is more convenient in the physical store. >>>More

3 answers2024-08-14

Of course, it is very good to use solid wood flooring for decoration, you can go to see the products of David flooring and ask for adoption.

1 answers2024-08-14

Yinai flooring's customer service will answer for you: laying wooden floors generally requires keel, which can isolate moisture and have a good foot feel.