Are there any standards for waterproofing kitchens and bathrooms?

Updated on Kitchen 2024-08-01
6 answers
  1. Anonymous users2024-01-24

    Bathroom waterproof specification 1:

    Make sure the floor of the restroom is stable. If you need to replace the floor tiles in the bathroom, after chiseling off the original floor tiles, be sure to level the floor with cement mortar first, and then do waterproofing treatment. This avoids leakage of the waterproofing coating due to uneven thickness.

    Bathroom waterproof specification two:

    The seams should be painted in place. The joints between the walls and floors of the bathroom and the joints between the water and water pipes and the floor are the most problematic areas.

    Toilet waterproofing specification three:

    Wall treatment is also important. In the general toilet waterproofing treatment, the wall should also be made about 30 cm high waterproof paint to prevent water from penetrating the wall. However, if the wall of the bathroom is a non-load-bearing lightweight wall, the entire wall should be coated with waterproof paint.

    Bathroom waterproof specification four:

    The waterproof experiment must be done. After the construction of the toilet is completed, all the sewer in the toilet is blocked, and a 25 cm high "barrier" is built at the door, and then 20 cm high water is poured into the bathroom.

    Bathroom waterproofing specification five:

    Keep the sewer pipes clear. All sewer pipes in the bathroom, including floor drains, plumbing pipes for sanitary ware, etc., should be kept unobstructed.

  2. Anonymous users2024-01-23

    Waterproofing standards for bathrooms and kitchens.

    1.Waterproof material for waterproof construction.

    2.The performance of waterproof materials shall comply with the provisions of the current national standards, and there shall be a product qualification certificate.

    3.The surface of the base should be smooth, and there should be no defects such as hollowing, sanding, and cracking. The moisture content of the base layer should meet the construction requirements of waterproof materials.

    The waterproof layer should extend from the ground to the wall, 250mm above the ground. The height of the waterproof layer on the bathroom wall shall not be less than 1800mm.

    4.The waterproof cement mortar screed layer is densely combined with the foundation, without hollowing, the surface is smooth and clean, no cracks, sanding, and the yin and yang angles are made into an arc.

    5.The waterproof layer of the coating film is evenly brushed, and the thickness meets the requirements of the technical regulations of the product, and the general thickness is not less than the bottom.

    6.The use of construction stubble should be lapped in the direction of flowing water, and the lap width should not be less than 100mm, and more than two layers of fiberglass cloth should be staggered by half of the width when lapping up and down.

    7.The surface of the coating film is not blistered, does not flow, is smooth and has no concave and convex, and the joints of pipe fittings, sanitary ware feet, floor drains, and drainage outlets are tight, and the end is smooth and does not leak.

    8.The thickness and strength of the protective layer cement mortar must meet the design requirements, and it is strictly forbidden to destroy the waterproof layer during operation, and the ground flooding slope should be done according to the design requirements, and the drainage should be smooth, and there should be no water accumulation.

    9.After the completion of the waterproofing project, a 24-hour water storage test must be done.

  3. Anonymous users2024-01-22

    The performance of waterproof decorative materials shall comply with the provisions of the current national standards, and there shall be a product qualification certificate. It can be done in several ways:

    The surface of the base should be smooth, and there should be no defects such as hollowing, sanding, and cracking. The moisture content of the base layer should meet the construction requirements of waterproof Changsha decorative materials.

    The waterproof layer should extend from the ground to the wall, 250mm above the ground. The height of the waterproof layer on the bathroom wall shall not be less than 1800mm.

    The waterproof cement mortar screed layer is densely combined with the foundation, without hollowing, the surface is smooth and clean, no cracks, sanding, and the yin and yang angles are made into an arc.

    The waterproof layer of the coating film is evenly brushed, and the thickness meets the requirements of the technical regulations of the product, and the general thickness is not less than the bottom.

    The use of construction stubble should be lapped in the direction of flowing water, and the lap width should not be less than 100mm, and more than two layers of fiberglass cloth should be staggered by half of the width when lapping up and down.

    The surface of the coating film is not blistered, does not flow, is smooth and has no concave and convex, and the joints of pipe fittings, sanitary ware feet, floor drains, and drainage outlets are tight, and the end is smooth and does not leak.

    The thickness and strength of the protective layer cement mortar must meet the design requirements, and it is strictly forbidden to destroy the waterproof layer during operation, and the ground flooding slope should be done according to the design requirements, and the drainage should be smooth, and there should be no water accumulation.

    After the completion of the waterproofing project, a 24-hour water storage test must be done.

  4. Anonymous users2024-01-21

    Bathroom waterproofing should be done closed water experiment, that is, the bathroom is full of water, closed for more than 24 hours, if there is no water seepage, it means that there is no problem

  5. Anonymous users2024-01-20

    Waterproofing should be done 2 to 3 times, the surrounding wall foot should be about 20 cm, test the water after drying, (this is the workmanship standard), and finally take no leakage as the standard.

  6. Anonymous users2024-01-19

    1. Construction code for residential decoration engineering GB 50327-20012, construction manual.

    3. Engineering design drawings and standard atlases.

    4. Instruction manual of the waterproof material used.

    5. Other local or enterprise process standard manuals.

    6. The "Technical Code for Residential Indoor Waterproof Engineering" is being revised and submitted for review and has not yet been officially released.

Related questions
2 answers2024-08-01

You can try the permeable waterproofing.

Dig the best permeable waterproofing can be done by yourself. >>>More

3 answers2024-08-01

1. All bathroom water tanks have nine animal husbandry, constant clean, can be, because the frequency of use is relatively high, so we must choose, one is excellent quality, long service life, the second is large flushing, easy to clean, and the third is the water tank with after-sales service in place.

1 answers2024-08-01

Kitchen and bathroom adjacency is the most common.

If it is side by side, there is no problem with opening the windows to face north. If the windows are all open in the ventilation shaft, and the windows are next to each other, this kind of air will rush to each other, which is not very good. >>>More

4 answers2024-08-01

The smell in the bathroom is mostly from the sewer, and the reason may be that the water seal somewhere is not done properly and needs to be carefully checked. Water seals are required in the following areas, such as floor drains, sink or mop sink bends, washing machine drain hoses and drains, shower drain hoses and drains. >>>More

2 answers2024-08-01

1. In China, according to the traditional principles of Feng Shui, the direction of the toilet must not be consistent with the direction of the door, for example, the direction of the door is facing south, and when a person sits on the toilet, it is also facing south, which is a taboo that the direction of the toilet is consistent with the direction of the door. >>>More