Consult an expert, the bathroom drainage pipe should be wrapped with bricks, and the pipe and the br

Updated on Bathroom 2024-08-12
4 answers
  1. Anonymous users2024-01-24

    If it is a bathroom riser, then of course, there is no need to fill it, waste materials, and it is not convenient to check and repair. If the branch pipe is buried in the floor (in the descending layer), it should be buried with cement mortar, which can protect the branch pipe.

  2. Anonymous users2024-01-23

    It cannot be filled, because if it is filled with cement, it will not be possible to repair the pipeline once it leaks.

  3. Anonymous users2024-01-22

    The pipe and the brick should be filled with mortar, and the anti-seepage treatment should be done to prevent sewage from seeping into the ground level from outside the pipe wall and corroding the ground.

  4. Anonymous users2024-01-21

    Depending on your situation, if you want it to be strong and the pipes don't leak, it's best to fill it up so it doesn't break. If it is empty, when the water pipe breaks, you will leak a lot of water and accumulate a lot of debris, causing big problems.

Related questions
1 answers2024-08-12

1 Make a hole in the floor slab.

2. Before the installation of the drainage pipeline, the civil engineering negotiation shall be required to pay off, find the size of the dump of sanitary appliances and the height of the rejection, install the trunk pipe, the riser pipe to the branch pipe in turn, and verify whether the coordinates are accurate again before the civil engineering plugging the floor hole. >>>More

1 answers2024-08-12

It's probably relatively simple.

It could be that you just do what is prescribed. >>>More

8 answers2024-08-12

1) base treatment, first the embedded nozzle periphery is not dense concrete carefully chiseled off, the thickness of chiseling is about one-third of the plate thickness, when chiseling the caisson concrete floor slab to be inclined plane chiseling, careful construction, can not destroy the concrete floor slab that most of the pit is retained below, then rinse the chiseled part with clean water, and the base cleaning must ensure that it is clean, no debris such as broken concrete; >>>More

3 answers2024-08-12

This is a pipe, and the pipe that is wrapped is a serpentine pipe, which is to prevent the pipe from flowing back, and to prevent the pipe from forming negative pressure.

1 answers2024-08-12

Different regions, labor costs are different, market prices are also different, I suggest you go to the regional question