-
This is simple, find the square to fill the leakage, and re-paste the floor tiles on it, which is very effective! That is, pour the asphalt on the line.
-
The most direct way is to disassemble and redo waterproofing, and find a good flooding when tiling.
-
It is recommended that you start from scratch, put the floor tiles up, dig out the cement layer, and then do waterproofing, Medeland is very good, 24-hour closed water test, confirm that there is no problem, and then lay the bricks.
-
The best way to do it is to do it waterproofing, and the cheapest way to do it is to plug the leak with water.
The key depends on which part of you are leaking, the water pipe? Sewer? If it is a water pipe, it will be troublesome, you must smash the filial piety to call off the floor tiles to cut off the leaking pipe, re-iron the pipe, and then re-pave the floor tiles! >>>More
It is possible to use the grouting method. But I have to ask for the consent of 1 downstairs.
First, use an odor-proof floor drain.
Second, close the edge of the hose at the underwater outlet of the handwashing, and make a reverse bend for the hose by hand. >>>More
Make the bathroom door a sliding door, or use a screen, if it is not suitable to use a screen, use a tall position as a shield, or make some bright ornaments on the door.
How do you prevent cracks in the bathroom floor from leaking water? >>>More