Paste the floor tiles and leak water in the bathroom

Updated on Bathroom 2024-08-26
1 answers
  1. Anonymous users2024-01-24

    It should be that you did not do a good job of waterproofing during construction to cause this, ask the master if you can solve it.

Related questions
2 answers2024-08-26

A special magnetic painting is attached to the tiles. It looks like it's printed, and it won't fade for a long time. >>>More

2 answers2024-08-26

Support sctmy! Articulation by carpenters.

Is the gate (or pass) set? If it is not decided, it can be connected by the door sleeve board (or pass), which is commonly known as "woodworking technology". With the advancement of technology and materials, woodworking is no longer the traditional definition, and the projects completed by traditional craftsmanship can be collectively called "carpentry". >>>More

2 answers2024-08-26

What is the sinking type, it should be a hollow drum, just if there is no space.

4 answers2024-08-26

In general, caulking can be carried out 24 hours after the tile is paved, and it is recommended to walk and step on it until 48-72 hours after the caulking is completed. >>>More

2 answers2024-08-26

After the waterproofing is done, if there is no problem with the closed water, the water leakage after the brick is pasted may be the brick is to smash the waterproof layer, the floor drain and the pipeline are the weak parts of the waterproof, or the material is not up to standard, or the construction is not standardized, and the leakage is thrown bricks and redone waterproof.