Toilet drain remodeling

Updated on Toilet 2024-08-17
1 answers
  1. Anonymous users2024-01-24

    Yes, three holes need to be punched - floor drain, basin drainage, and toilet. Need pvc sewer pipe 110 tee 2 110 connector 1 110 to 50 diameter 1 50 tee 1 50 bend 2 110 and 50 pipes each a few lengths (according to the actual situation to measure the length), PVC glue bucket (medium) 2 pieces of sandpaper (grinding the bonding part), pay attention to the PVC sewer pipe when buying. 110 tee and connector connected to the water main, tee median connection 110 straight pipe toilet below 110 tee, tee median straight pipe rise out of the attic ground 40-50CM (toilet position complete), the other side of the tee under the toilet is connected to 110 straight pipe and then connected to the diameter - the tee of the basin and the reverse bend - grounding leakage bend.

Related questions
2 answers2024-08-17

Teach you a way:

Glue the pipes first. (Note that the glue must be good!! Specializing in sticking things like this) (there are also tricks for sticking pipes, oh, don't underestimate this). >>>More

4 answers2024-08-17

This is really difficult, because the sewer pipe layout of the toilet in your bathroom is generally at the top of the downstairs bathroom, if you want to change it can only be carried out opposite your bathroom, so that the floor of the bathroom will be raised, and the bathroom will be higher if there is floor heating, and there is also the problem of waterproof layer, if it is not done well, it is likely to leak the problem, so it is not recommended that you change.

3 answers2024-08-17

As long as the hole of the toilet bowl and the hole of the drain are opposite, the sealing ring is installed, and then the toilet is sealed well, there will be no leakage and poor drainage, and the leakage place will be re-pasted with transparent glass glue

3 answers2024-08-17

There should be a downward inclination of 10 cm for each meter of extension.

1 answers2024-08-17

The toilet is clogged, and the sewer pipe structure is remodeled. You can thicken the pipe diameter as much as possible, reduce the elbow, reduce the resistance to discharge sewage, and make the toilet drain easier.