Plastering. Windows. Ceiling. Floor tiles. Technical requirements for finishing engineering

Updated on Suspended ceilings 2024-08-29
1 answers
  1. Anonymous users2024-01-24

    The most authoritative is, of course, the norm shall prevail, and all that can be passed on are the internal standards of the enterprise.

Related questions
2 answers2024-08-29

These three processes are to be crossed. Before plastering, the window frame should be installed, and the ceiling can be suspended after the plastering is completed, and the ceiling construction can be carried out at the same time when installing doors and windows.

2 answers2024-08-29

This is the case for general building construction procedures, but there are special practices. Especially for super high-rise buildings, when the upper main structure is still under construction, the lower outer curtain wall has kept up, which is ahead of time.

2 answers2024-08-29

There is a ceiling plaster, but also the whole wall is plastered, because when the ceiling is fixed, there is no full plastering, the fixed position is because it is the edge of the plastering or close to the edge, it is easy to empty the shell, and the full plastering of the ceiling frame will not affect the plastering layer of the eye-punching team.

1 answers2024-08-29

3. I don't understand what I mean.

I guess that's what it says. Ordinary finishing refers to the application with a manual brush. >>>More

1 answers2024-08-29

【Harbin Home World Decoration Company】About 10-15 days!