Which one knows whether the bathroom is waterproof or tiled first

Updated on Bathroom 2024-08-21
2 answers
  1. Anonymous users2024-01-24

    The main reason is: the waterproof layer is weaker than the structural layer and wall tiles, floor tiles, etc., and the waterproof project is an overall system, if the local damage occurs, it is possible to make the overall waterproof fail.

    Therefore, it is treated as a concealed project, and finally it can be protected with wall tiles and floor tiles.

  2. Anonymous users2024-01-23

    It must be done waterproofing first, not only on the ground, but also below the wall, it is best to do it two or three times, and then put the water and seal it for two or three days, to see if there will be water seepage downstairs, and will not ask the master to paste tiles.

Related questions
3 answers2024-08-21

Do waterproofing first, it is best to use waterproof materials with water, and then paste tiles after confirming the effect, otherwise you have to rework.

2 answers2024-08-21

It is better to do waterproofing first, and then make the door frame. But the waterproof material must meet the national standard, don't be greedy for cheap. If you don't want to dig the ground and dig the wall in the future, just listen to me.

5 answers2024-08-21

Waterproofing must be done before tiling.

The main reasons are: >>>More

1 answers2024-08-21

Toilet waterproofing practices:

1. Ground treatment. >>>More

2 answers2024-08-21

Do hydropower first, and then do waterproofing developers do poor waterproof quality, or do it yourself again, Dongfang Yuhong, JCDecaux waterproof quality is very good, as for the process, or let them do it themselves, you just have to pay.