    In the whole process of home decoration and decoration construction, turning the initial rough house into your own warm home can be broken down into ten steps:

    Step 1: Switch to plumbing.

    Water, including the location and layout of the kitchen and bathroom water pipes. According to the principle of ergonomics, the height and position of the water pipe often have to be changed greatly, for example, the water pipe access height of the toilet may not be the same as the reserved height.

    electricity, mainly considering the transformation of energized lines. Change the location and number of switches and sockets to make them more rational.

    warm, heated or underfloor heating. It needs to be designed in advance.

    The reason why water, electricity and heating are listed as the first step is that if the early consideration is not thorough, it will lead to inconvenience in construction and an increase in decoration costs.

    Step 2: Floor tiles and wall tiles.

    In the first step, after the water, electricity and heating are adjusted, it is necessary to pave the floor tiles and wall tiles (kitchen and bathroom).

    Step 3: House ceiling.

    Suspended ceilings for living rooms, bedrooms, study, dining rooms, kitchens, bathrooms, and balconies.

    Step 4: Wrap the door and mouth.

    The decoration of doors and windows, as well as the production of some furniture accessories, such as entrance treatment, TV background wall production, etc. If you choose synthetic doors and windows, they will be placed at the end of the construction.

    Step 5: Painting the walls.

    Wall painting, you can use painting, wallpaper, wall covering, etc.

    Step 6: Primer topcoat.

    Priming and topcoat of doorways, windows, and parts of furniture.

    Step 7: Lighting installation.

    Install all the lamps in the room, including all kinds of ceiling lights, downlights, chandeliers, spotlights, etc.

    Step 8: Ventilation and cleaning.

    Maintain good ventilation conditions and sufficient ventilation time.

    Overall cleaning, clean living environment, bright and beautiful life.

    Step 9: Warranty matters.

    After the completion of the decoration, due to the construction period, the quality of materials, construction technology and other reasons, over time, cracks, deformation, discoloration, falling off, water leakage and other phenomena may occur, so pay more attention to it, and contact the construction party in time after finding it to remedy.

    Step 10: Move The above is the information of netizens, I hope to help you.