-
The first is to consider the problem of space, which can be put down; The second and more important is the load-bearing problem of the building, the water is very heavy.
-
As long as you can put it down, it's fine.
The upstairs living room has a floor, and the downstairs can be stopped, depending on what time it is, it can't be stopped during normal working hours, and it can be stopped during breaks.
Don't be ashamed to ask. Animals are converted to humans, and all people of the same kind help each other, and there are many people of the same kind who do good.
A repeater (twisted pair extender) is about 500. Up and down can be piped 300-500 meters. >>>More
The upstairs is right, you have to negotiate with the upstairs before dealing with it. It needs to be added that the sewer pipe is connected to the main pipeline for sewerage, and this part should be dealt with. Just in case.
It's better to get a picture and see it, and I'll give you the answer, and it's better not to decorate, so the layout is better, and it's going to be decorated, and then it's going to be difficult.