Downstairs bathroom to replace the water pipes should be redone waterproofing

Updated on Bathroom 2024-07-07
1 answers
  1. Anonymous users2024-01-24

    Yes.

    1. First level the ground with cement mortar, and then do waterproof treatment, clean the ground first, and repeatedly paint 2 to 2 with high permeability modified epoxy waterproof coating (KH-2).

    3 times. The joints between the wall and the ground and the joints of the pipes between the water and the water are the places that are most likely to cause water leakage in the bathroom.

    2. Give the upper and lower water pipes of the kitchen and bathroom.

    Do a good job of cement mulching, and brush 10 to from the ground.

    20 cm high permeability modified ring.

    Oxygen waterproof coating (KH-2), and then the ground is redone with high-permeability modified epoxy waterproof coating.

    KH-2) to enhance waterproofness, only in this way can it be better placed. "Leakage test" to test waterproofing After the waterproof project is completed, the bathroom leakage test should be done, first seal the door and drain, fill the bathroom floor with water to reach a certain liquid level height, and make a mark, 24

    If the liquid level does not drop significantly within an hour, especially if there is no leakage on the roof of the house downstairs, the waterproofing will be closed.

    3. If the acceptance is unqualified, the waterproof project must be redone as a whole and re-accepted. The waterproof experiment must be done. After confirming that there are no leaks, the floor tiles are laid.

    There is often water in the bathroom, and it is easy to slip when walking on it, so it is best to use a raised flower.

    Grained non-slip floor tiles, this kind of floor tiles not only have good waterproof properties, but also will not be too slippery even in the case of water. At the same time, the ground should be slightly inclined to the floor drain to facilitate flushing and cleaning.

Related questions
6 answers2024-07-07

Independent sewer pipes, straight 3 drainage channels must also have a trap, odor insulation, if you want to save it, you can also share a trap with the toilet!

2 answers2024-07-07

We have opened the window in our house, and we have also opened a small window and installed an exhaust fan.

4 answers2024-07-07

Summary. Bathroom sewer pipe bricking is best built to the top. If it is not built to the top, it must also be built to the place where the ceiling is suspended. Before laying bricks for the sewer pipe, it is best to wrap the sewer pipe with soundproof cotton, which can reduce some of the noise when flushing upstairs. >>>More

3 answers2024-07-07

to be cleared.

Waterproof method: The ordinary residential bathroom is narrow, and there are pipelines passing through the floor, etc., so the coating is commonly used for waterproofing and the membrane is rarely used for waterproofing. >>>More

2 answers2024-07-07

Look at how well your bathroom waterproofing, if your bathroom waterproofing is good, the storage room will not be particularly troublesome, on the contrary, your bathroom waterproofing is not good, waiting to leak downstairs, be careful of neighbors coming to you