How to drain the toilet closed water test, how to drain the toilet closed water test

Updated on Toilets 2024-07-03
1 answers
  1. Anonymous users2024-01-24

    1. When the toilet is closed, the first thing is to seal the floor drain tightly with filler, and the closed water test is qualified, and the filler water that removes and plugs the floor drain is discharged from the floor drain.

    All kinds of waterproof coatings are clearly stipulated in the implementation standards of products, and the requirements for the final setting time are different for different products.

    3. However, in general, such as the commonly used "general-purpose K11 waterproof slurry", the water can be tested 24 hours after normal construction. The water test time is 24-48 hours to check the downstairs, and there is no water leakage.

Related questions
1 answers2024-07-03

It's best to do it, in case you run out of water and flood downstairs it's troublesome.

1 answers2024-07-03

Just find some fine sand or dirt to use outside – just clean up after the closed water test!

2 answers2024-07-03

3. Under normal circumstances, the balcony needs to do the closed water test, and when the balcony waterproof acceptance is completed, the acceptance work needs to be tested for 24 hours of closed water, and the light wall, corner joints and other places need to be drenched to test the water seepage.

2 answers2024-07-03

The bathroom did not do a good job of waterproofing, and in principle, it had to be smashed and redone. There is an economic loss for sure, and it will be higher than the cost of renovating the bathroom for the first time, because the master in the industry would rather take the work of decorating the rough house than taking the work of repair. As for the damage to the structure of the house, as long as the construction is reasonable, the use of electric hammer instead of real hammer will not cause damage to the structure of the house. >>>More

7 answers2024-07-03

After the bathroom is waterproofed, it needs to be thoroughly dried, so that it can do the closed water test, you can contact the residents downstairs in advance, so that the leakage can be informed in time to avoid unnecessary losses of the downstairs residents When doing the closed water test, the depth of water storage can not be less than 20 cm, and the time can not be less than 72 hours, and the water level does not fall is qualified.