What to do if the bathroom floor is higher than the threshold of the hall

Updated on Bathroom 2024-07-09
2 answers
  1. Anonymous users2024-01-24

    Retrograde L-shaped door stones.

  2. Anonymous users2024-01-23

    I didn't make it clear, is it after the renovation is finished or??

Related questions
11 answers2024-07-09

The first step is to remind everyone that the water circuit of the bathroom should be observed and transformed in combination with the actual situation, so as to have a detailed understanding of the concealment project. After the plan is determined, the water, electricity and heating pipes are laid and chiseled. Secondly, in the base treatment, the original decorative materials should be cleaned before the waterproofing project of the bathroom, and then the several sides are paved with cement slurry, and then the waterproof treatment is carried out. >>>More

9 answers2024-07-09

1. Bathroom waterproof construction steps.

Step 1: You can use a slightly coarser cement to base the foundation first, and then brush the waterproof paint after the cement is dry. But in painting money, the ground should be flat and there should be no grooves. Water is then sprinkled on the ground to expel the gas from the small holes. >>>More

1 answers2024-07-09

Do a good job of flooding the bathroom, and the floor drain is at the lowest place, which is really not good, just add a threshold at the door of the bathroom.

6 answers2024-07-09

1. When laying bathroom floor tiles, lay a joint layer with a thickness of two centimeters or less than two centimeters, and adopt a thin paste. >>>More

7 answers2024-07-09

The simpler way to do this is to remove the tiles, make a layer of waterproof paste, and then re-apply the tiles with tile adhesive.