When the house was handed over, a closed water test was done, and the bathroom water seepage was fou

Updated on Bathroom 2024-07-11
3 answers
  1. Anonymous users2024-01-24

    This is the developer's cutting corners, and it is also the result of most owners letting their actions go unchecked.

    The quality requirements of the finished house are to ensure that the owner can move in normally, and do the waterproofing by himself during the decoration, which is afraid that the waterproof layer will be destroyed during the decoration process.

    Like they say, the decoration should be waterproof, but what if it is not renovated? Can I stay here? If the negotiation is not good, you can complain to the Consumer Association.

  2. Anonymous users2024-01-23

    In addition to the waterproofing, the water seepage may not be able to tolerate the quality of the concrete soil of the floor slab, or there is a problem with the joint between the pipe and the floor slab, which can not be solved when decorating.

    What should I do if there is still water seepage after the renovation? The responsibility becomes your own, and the developer will be relieved of the responsibility.

  3. Anonymous users2024-01-22

    Depending on your situation, bai I have.

    du Here are a few suggestions:

    Wait for the room. Later, after the transformation of water and electricity, the original waterproof layer was basically broken, and it was indeed necessary to re-do the waterproofing by yourself.

    If there is a problem with the waterproofing, then the owner has the right to urge the developer to rectify, and then take over the house after qualifying.

    After doing the waterproofing by yourself, you also need to do a 48-72 hour closed water test, and then proceed to the next step after passing the inspection.

Related questions
1 answers2024-07-11

Just find some fine sand or dirt to use outside – just clean up after the closed water test!

2 answers2024-07-11

The bathroom did not do a good job of waterproofing, and in principle, it had to be smashed and redone. There is an economic loss for sure, and it will be higher than the cost of renovating the bathroom for the first time, because the master in the industry would rather take the work of decorating the rough house than taking the work of repair. As for the damage to the structure of the house, as long as the construction is reasonable, the use of electric hammer instead of real hammer will not cause damage to the structure of the house. >>>More

7 answers2024-07-11

After the bathroom is waterproofed, it needs to be thoroughly dried, so that it can do the closed water test, you can contact the residents downstairs in advance, so that the leakage can be informed in time to avoid unnecessary losses of the downstairs residents When doing the closed water test, the depth of water storage can not be less than 20 cm, and the time can not be less than 72 hours, and the water level does not fall is qualified.

3 answers2024-07-11

After 24 hours of waterproofing, the water will be closed, and the water level at the highest point of the plane shall not be less than 2 cm. The entrance is built with a waterproof edge. Acceptance after 24-48 hours of water closure.

3 answers2024-07-11

Here are a few things you need to know before the closed water test. >>>More