After the kitchen is finished with the suspended ceiling, do you do countertop carpentry, not wall c

Updated on Kitchen 2024-07-14
2 answers
  1. Anonymous users2024-01-24

    Yes, remember that the order is from top to bottom.

  2. Anonymous users2024-01-23

    Yes, please use waterproof and anti-fouling Oupin aluminum ceiling for kitchen ceilings.

Related questions
6 answers2024-07-14

The walls and floor tiles must be glued before making cabinets.

4 answers2024-07-14

Although the tile is hard, but after the paving is also need to be protected, otherwise the decoration materials are pulled around on the ground, and the tiles will inevitably have scratches. >>>More

1 answers2024-07-14

The aluminum gusset ceiling is equipped with a soundproof partition, and the sound insulation effect of the whole space will be a little, but it will not reach a certain decibel value.

6 answers2024-07-14

Install the pipe first, and then do the waterproofing.

Good luck. >>>More

1 answers2024-07-14

It is recommended to wait until the sliding doors are installed before cleaning. >>>More