The kitchen and bathroom are slotted to the floor or the wall

Updated on Kitchen 2024-07-28
5 answers
  1. Anonymous users2024-01-24

    Kitchen: The line pipe can go underground, because the line pipe is 16, and the water pipe is better slotted.

    Bathroom: The line pipe is best slotted on the wall, the light line above can be covered with a suspended ceiling, the water pipe can go underground, if there is no crossing, there is no need to groove in the ground, and the water pipe should also minimize crossing. The waterproofing of the bathroom should be done well.

    If the back of the bathroom is a bedroom, it is best to do waterproof treatment on both sides of the bedroom and bathroom walls.

  2. Anonymous users2024-01-23

    It is better to walk on the ground

    Because the ground is sufficiently insulated and waterproof compared to the wall, and the wall of the frame structure of the house can be changed, it will be very troublesome to change it later if you take the wall

  3. Anonymous users2024-01-22

    In some places, the water goes to the top, and the electricity goes to the ground.

    Our hydropower is on the ground, and in some places the water is on the top, look, in fact, as long as it is done, it is the same as walking, hydropower is the main event, we must do a good job, otherwise it will be troublesome in the later stage.

    Take a look at the connection I sent, which is dedicated to hydropower transformation.

  4. Anonymous users2024-01-21

    Open a vertical groove in the wall, the water pipe is not grooved on the ground, and the floor tiles can be pressed directly back to the wall, and the bathroom wires go to the top or the wall does not go to the ground.

  5. Anonymous users2024-01-20

    Slotting will definitely destroy the waterproofing, it's the same everywhere, but the waterproofing has to be redone again, and it will be troublesome to leak downstairs.

Related questions
2 answers2024-07-28

If the bathroom has not been paved with floor tiles, then you can not slot, the bathroom floor slotting will destroy the waterproof layer, and the future will be endless, so it is better to pave the floor tiles a little higher than to not slotted as much as possible.

10 answers2024-07-28

There is no need to do waterproof in the tank, and the closed pipe is not easy to break. Once the pipe is broken, the waterproofing in the tank will not play much role, and the leakage water will drill everywhere between the waterproof layer of the ground and the waterproof layer in the tank, which will bring inconvenience to maintenance. >>>More

9 answers2024-07-28

The place where the groove has been opened is waterproofed on one side, and the waterproof should cover the original waterproof for more than 10 cm, and then bury the thread in the groove.

3 answers2024-07-28

If you don't need it, it will be mended after slotting, and then waterproofing, and then a closed water test.

1 answers2024-07-28

When choosing floor tiles, it is important to consider the following aspects: First, it depends on the brand. Only well-known brands of floor tiles, the quality of their building materials can meet the national standards, and the content of harmful substances can be within a safe range. >>>More