Toilet water pipes, electrical circuits are installed. Now the question is to backfill the sediment

Updated on Bathroom 2024-07-29
5 answers
  1. Anonymous users2024-01-24

    The common practice is to backfill the sediment and compact, and then use cement mortar to level the base surface (ground and wall), and wait for the screed to dry and solidify before doing waterproofing.

  2. Anonymous users2024-01-23

    My house is decorated and leveled with waterproofing.

  3. Anonymous users2024-01-22

    After the ground is leveled, make a waterproof layer.

  4. Anonymous users2024-01-21

    It is better to do waterproofing first, and then do it again after backfilling.

  5. Anonymous users2024-01-20

    Use concrete mortar to level and dry before waterproofing.

Related questions
1 answers2024-07-29

Surface-mounted pipes are laid indoors along walls, beams, columns, under ceilings, and next to floors. Its advantages are low cost, convenient construction, installation, maintenance and repair. The disadvantage is that the surface of the pipeline is dusty, condensation, etc., which affects environmental hygiene. >>>More

4 answers2024-07-29

It depends on whether you are installing water pipes inside the wall or outside the wall, first consider whether it will affect the powder wall after installation, whether there will be powder in the place, if the gap is large, it will not be affected, and it can be installed in the powder.

2 answers2024-07-29

Sewer pipes made according to specifications or conventions are not afraid of hot water, but do not shoot it to break. If the hot water goes and it becomes soft, it must be replaced, otherwise it will soon be an accident.

4 answers2024-07-29

The pressure should be tested first and then closed, so that the loopholes can be repaired in time after the pressure test, so as to avoid the repeated operation of sealing first and then testing the pressure, and then opening the seal when there is a problem.

4 answers2024-07-29

When renting the house, he did not inform the bathroom of the leaking sewer pipe, and the current landlord asked for this on this ground, which is a breach of contract, because he knew that the sewer pipe was leaking before, which is a breach of contract. You can be compensated for liquidated damages.