The solid wood lock floor installed in my house in March has now been arched, and I don t know why

Updated on Solid wood 2024-07-06
1 answers
  1. Anonymous users2024-01-24

    There are many reasons why a solid wood lock floor arches. One is the quality of the floor itself, the moisture content is not well controlled, and the floor is dry and deformed, which is mainly reflected in the end cracks and the arching of the floor There is also a reason that the moisture-proof is not done well when the floor is installed, which causes the floor to be tiled, so that the floor is arched on both sides There is also a reason that the corners are warped due to the tight lock, which should be judged according to the deformation of your floor and the actual environment

Related questions
1 answers2024-07-06

Indonesian rosewood flooring.

Siming District, Xiamen City, Fujian Province. >>>More

3 answers2024-07-06

If there is a problem with the sealing of the joint, it may be that the sealing ring is not installed properly or the sealant is not properly installed.

1 answers2024-07-06

1. It is not necessary to choose a day for all the installation of furniture, but you can pay attention to the feng shui problems of the placement, such as the foot of the bed and the mirror should not be facing the door.

2 answers2024-07-06

According to the relevant provisions of the company, the amount of subsidy per person should be calculated or based on the company's documents on the subsidy, and the form of the wage table can be listed: serial number Name Summary (such as the company's ** number on the restaurant subsidy document) The amount payable The actual amount Deduction of individual income tax Signature of the recipient.

2 answers2024-07-06

You see if the developer has a "Housing Acceptance Certificate or Completion Acceptance Record Form" issued by the construction management department, and if so, use this date as the date of whether the delivery standard is met. The liquidated damages are also determined by this date and the delivery date agreed in the purchase contract between the developer and you at that time!