When to install the interior door

Updated on Inner door 2024-07-10
3 answers
  1. Anonymous users2024-01-24

    After laying the tiles, you can press the door after painting the wall.

  2. Anonymous users2024-01-23

    When you do the carpentry, you can install it when you are almost done.

  3. Anonymous users2024-01-22

    Everything is loaded.

Related questions
4 answers2024-07-10

The floor, walls, and ceilings are all masonry and lacquer workers and then install interior doors, and the doors are directly assembled after customization, saving money. >>>More

2 answers2024-07-10

It is definitely necessary to conceal the engineering part, if you find a decoration company, it is better to have a supervisor Hehe, if the concealed project is not done well, the ceiling will be very troublesome, keel material ceiling material gap treatment and so on It is best to find a place to hire a project supervisor Although it is a home decoration I think it is necessary.

2 answers2024-07-10

If you don't want to hurt the door, you can wipe it off with a wet towel, rub it hard, don't scratch it with a hard object, there will be scratches.

1 answers2024-07-10

1. All the ceilings are suspended first, and then the cabinets are installed. >>>More

3 answers2024-07-10

Within 300 square meters, there is a private room restaurant within 30-45 days, 100 square meters without a private room within 30 days, more than 1000 square meters of normal more than 2 months of construction period, the design is generally based on the hotel positioning high and low generally 1-3 days, 7-15 days, 15-45 days, if the restaurant in the square is generally normal for 1 month, because the restaurant decoration should also take into account the construction time and approval of fire protection, so the preliminary work should be done in place, the later speed will be fast, affecting the construction period of two points, a drawing is incomplete, The early design is not in place, the audit is difficult and there are too many changes in the later stage, and the second materials and personnel are not in place