What is the specific method of waterproofing and making a nest in the bathroom?

Updated on Bathroom 2024-07-20
3 answers
  1. Anonymous users2024-01-24

    "Make a nest"? Be specific.

    Toilet waterproofing practices:

    First of all, choose a waterproof material that is suitable for home decoration. It is recommended to choose the polymer cement-based waterproof coating slurry commonly used in home decoration, that is, the name on the market is: general-purpose, flexible, K11, JS, GS waterproof coating slurry, this kind of product is water-based coating, non-toxic, harmless and pollution-free, simple and fast construction, and cement substrate bonding tightly, long service life, strong waterproof effect, moderate price and other significant characteristics.

    Brands with good quality and good reputation, such as: Leibangshi, JCDecaux, Oriental Yuhong, etc.

    Clause. Second, the base surface (substrate) of the waterproof position should be treated. The base surface is treated into a firm, flat and clean surface, free of dust, greasy, wax and other debris substances; If there are pores, cracks and unequal defects on the base surface, it must be repaired and smoothed with cement mortar in advance, plastic strips are recommended to be pasted on the expansion joints, a layer of non-woven fabric must be added to the node, and the nozzle filling is recommended to use Leibangshi plugging king or nozzle grout; The corners of the wall should be plastered into an arc shape (or V-shaped); Make sure the base surface is sufficiently wet, but there is no open water;

    Clause. Third, pay attention to the waterproof construction in place. Use a brush or roller brush to apply directly to the base surface, and the strength is used evenly, and the brush should not be missed; Generally, it needs to be brushed twice (according to the requirements of use), and the thickness of each brush should not exceed 1mm; After the previous one is slightly dry, the next one is brushed (just non-sticky, generally at an interval of 1-2 hours), and the front and rear vertical cross brushing, the total thickness of the brush is generally 1-2mm; If the coating has already cured, moisten it with water first when applying another layer. Special attention should be paid to the corner part of the wall to be treated into an arc type and then painted, and the painting can not be too thick (the total thickness does not exceed 2); The pipe should be sleeved with a casing, and the holes of the casing and the wall should be filled with a plugging king, and the waterproof material should be brushed to the height of the casing 10 and not too thick;

    Clause. Fourth, pay attention to the position and height of waterproof painting. Ground; Generally, the wall is repainted and brushed 30 high; Paint the wall around the shower area 180 high or to the top of the wall; There is a bathtub where the upper brush is 30 higher than the bathtub.

    Clause. Fifth, do a good job of water test. After the waterproof coating is painted to form a waterproof layer (about 24 hours later), the water storage is 20 high, and after 24 to 48 hours, see if the water is significantly reduced or go downstairs to see if there are wet water spots on the roof, and if not, it means that the waterproof construction is successful.

    If you do the above five points completely, you will definitely be able to achieve the waterproof bathroom without any "wetness".

  2. Anonymous users2024-01-23

    The bathroom is waterproof on both sides of the floor, the shower area is reversed, and the ordinary wall is reversed by 30 cm. It is absolutely no problem to ensure that it is waterproof, remember to adopt it.

  3. Anonymous users2024-01-22

    Expert Xiao is explaining, "make a nest"? What do you mean, please make it clear.

Related questions
3 answers2024-07-20

1. All waterproofing works (waterproof coatings).

1.Clean up the dirt in the base layer and remove protrusions. >>>More

1 answers2024-07-20

The pipeline passes through the root of the floor slab to strengthen the waterproofing. After the pipe root building sealing paste is sealed tightly, and the cement is smoothed and the foot pads are smoothed, the glass wire cloth reinforcement layer is 1 or 2 layers when brushing the waterproof coating. The same measures are taken near the floor drain.

3 answers2024-07-20

1. Ground leveling before waterproof treatment. The ground is oriented to find the slope in the direction of the floor drain, the slope near the door is small, and the slope near the floor drain is large, which is mastered according to the specific situation. The slope in the shower room is generally about 8-10 degrees. >>>More

2 answers2024-07-20

No matter what method or steps are used to do waterproofing in the bathroom, remember these 6 points to ensure that there is no leakage.

6 answers2024-07-20

1. Inspect and accept the appearance, variety, specification, packaging, size and quantity of materials, and form corresponding acceptance records. >>>More